Forza Group completed this new fellowship hall and classroom addition. The open hall structure was a glue-laminated system with exposed tectum board decking.
The project was completed in approximately seven months of foundation. The third sump well extends to a depth of forty feet and also rests on a two-foot thick concrete foundation. In addition, at the center of the casting pit, there is a forty-two-inch diameter casing with a two-inch-thick steel bottom plate that is seventy feet deep. This casing houses the hydraulic cylinder that lifts the cast billets out of the pit.