Universal Environmental Services/Avista Oil
PROJECT DETAILS
Project Highlight: UES Industrial Energy Infrastructure
Forza Group has partnered with Universal Environmental Services (UES) since 2012 to deliver more than $15 million in industrial infrastructure projects supporting the company’s refining and energy operations. Across multiple facility upgrades and equipment installations, our teams have provided integrated construction services including structural steel fabrication and erection, process piping systems, electrical infrastructure, and engineering design support. Working within an active refining environment, Forza has coordinated the installation of critical production equipment and supporting plant utilities required to maintain safe and reliable operations.
Recent projects include the installation of a large industrial boiler system and supporting energy infrastructure designed to enhance plant efficiency and operational capacity. Forza performed the full installation of the Eco-Heater system, including engineering design, fabrication and erection of the supporting steel structure, precision equipment setting, and integration of process piping and ductwork systems. These projects demonstrate Forza Group’s ability to execute complex industrial energy installations that require close coordination between mechanical, structural, and electrical disciplines within highly technical processing facilities.
Since 2012, Forza Group has completed more than $15M in projects for UES, including:
- Structural steel fabrication and erection
- Process piping
- Engineering design
- Electrical
Recent projects include the installation of a large industrial boiler, with piping ranging from 1” to 10” in diameter and total installed lengths of more than 10,000 LF.
Pictured left: Forza Group installed an Eco-heater for UES, including design engineering, fabrication and erection of the steel structure, equipment setting, process piping, and ductwork.



